Decomm'n |
---|
Air quality (emissions) monitoring | OTM | Environmental monitoring | Continuous monitoring of changes throughout the lifecycle | on-shore | 0 | 1 | 2 | 3 | 1 |
Air quality monitoring on an airshed and site specific basis | Hatfield | Environmental monitoring | Baseline historic mapping of environment and ecosystems | on-shore | 2 | 2 | 2 | 4 | 0 |
Anticipating areas of high seismic impedance | OTM | Seismic planning | Areas of poor coupling | on-shore | 2 | 3 | 0 | 0 | 0 |
Assess coastal environment for infrastructure planning | Hatfield | Logistics planning and operations | Facility siting, pipeline routing and roads | on-shore | 3 | 1 | 4 | 2 | 1 |
Assess and map forest fire risk and provide situational awareness of fire occurrence | Hatfield | Seismic planning | Identification of environmentally sensitive areas | on-shore | 1 | 2 | 2 | 2 | 1 |
Assess fragmentation of natural habitat and cumulative disturbance | Hatfield | Environmental monitoring | Baseline historic mapping of environment and ecosystems | on-shore | 3 | 3 | 3 | 2 | 2 |
Assess forest characteristics to plan access and assess hazards | Hatfield | Seismic planning | Identification of adverse terrain for trafficability | on-shore | 2 | 4 | 2 | 2 | 1 |
Assessing ground deformation to support enhanced recovery operations | Hatfield | Subsidence monitoring | Reservoir management | on-shore | 0 | 1 | 1 | 4 | 2 |
Assess habitat for key species for environmental baseline and/or impact assessment | Hatfield | Environmental monitoring | Baseline historic mapping of environment and ecosystems | on-shore | 2 | 3 | 4 | 1 | 1 |
Assess and manage forest fire risk to facilities and infrastructure | Hatfield | Environmental monitoring | Natural hazard risk analysis | on-shore | 0 | 4 | 4 | 4 | 2 |
Assess potential project site for historical use | Hatfield | Logistics planning and operations | Baseline mapping of terrain and infrastructure | on-shore | 1 | 0 | 4 | 3 | 3 |
Assessing the social impact of construction work | OTM | Environmental monitoring | Continuous monitoring of changes throughout the lifecycle | on-shore | 4 | 4 | 4 | 4 | 4 |
Assessing terrain stability for infrastructure planning in permafrost environments | Hatfield | Logistics planning and operations | Facility siting, pipeline routing and roads | on-shore | 2 | 2 | 3 | 4 | 0 |
Assessment of duricrusts and rock excavability | Hatfield | Surface geology mapping | Engineering geological evaluation | on-shore | 1 | 2 | 3 | 1 | 1 |
Assessment of infrastructure placement and effects to the surrounding environment | Hatfield | Subsidence monitoring | Infrastructure monitoring | on-shore | 2 | 2 | 4 | 4 | 0 |
Avoiding aerial mapping restrictions | OTM | Logistics planning and operations | Baseline mapping of terrain and infrastructure | on-shore | 1 | 1 | 1 | 1 | 1 |
Baseline elevation data for project planning and design | Hatfield | Logistics planning and operations | Baseline mapping of terrain and infrastructure | on-shore | 1 | 3 | 3 | 1 | 2 |
Baseline imagery for project planning and design | Hatfield | Logistics planning and operations | Facility siting, pipeline routing and roads | | | | | | |
Baseline and monitoring of areas with active faults and subsidence | Hatfield | Subsidence monitoring | Land motion relating to fault lines or other causes | on-shore | 2 | 3 | 3 | 3 | 2 |
Change detection of coastline migration | OTM | Environmental monitoring | Baseline historic mapping of environment and ecosystems | on-shore | 1 | 0 | 3 | 0 | 0 |
Change detection for competitive intelligence | OTM | Logistics planning and operations | Monitoring of assets | on-shore | 3 | 3 | 4 | 0 | 0 |
Characterisation of surface/near-surface structural geological properties for infrastructure planning | Hatfield | Surface geology mapping | Engineering geological evaluation | on-shore | 1 | 2 | 3 | 1 | 1 |
Coastal elevation data for tsunami risk analysis | Hatfield | Environmental monitoring | Natural hazard risk analysis | on-shore | 0 | 4 | 4 | 4 | 0 |
Coastal morphology | CLS | Environmental monitoring | | off-shore | 0 | 0 | 4 | 0 | 0 |
Coastal resource mapping of mangroves, coral-reefs, wetlands and sandbanks | C-CORE | Environmental monitoring | | off-shore | 1 | 1 | 1 | 1 | 1 |
Coastal sediment dynamics, estuarine fronts and land-ocean interactions | C-CORE | Environmental monitoring | | off-shore | 0 | 1 | 1 | 1 | 0 |
Coastal upwelling | C-CORE | Environmental monitoring | | off-shore | 1 | 1 | 1 | 1 | 1 |
Commercial and recreational fisheries | C-CORE | Environmental monitoring | | off-shore | 2 | 2 | 2 | 2 | 2 |
Commercial shipping | C-CORE | Environmental monitoring | | off-shore | 2 | 0 | 0 | 0 | 0 |
Convective downbursts | C-CORE | Metocean | | off-shore | 1 | 3 | 1 | 3 | 2 |
Creating an ecosystem inventory prior to exploration | OTM | Environmental monitoring | Continuous monitoring of changes throughout the lifecycle | on-shore | 3 | 4 | 0 | 0 | 0 |
Creating basemaps in politically sensitive regions | OTM | Logistics planning and operations | Baseline mapping of terrain and infrastructure | on-shore | 2 | 2 | 0 | 0 | 0 |
Current at depth observations | C-CORE | Metocean | | off-shore | 2 | 4 | 3 | 4 | 3 |
Detecting ecosystem damages | OTM | Environmental monitoring | Continuous monitoring of changes throughout the lifecycle | on-shore | 0 | 2 | 2 | 4 | 4 |
Detecting hydrocarbon leaks | OTM | Environmental monitoring | Continuous monitoring of changes throughout the lifecycle | on-shore | 0 | 0 | 1 | 3 | 2 |
Detection and monitoring of pollutant discharges | C-CORE | Environmental monitoring | | off-shore | 1 | 3 | 3 | 3 | 3 |
Detection of oil contamination and oil seeps | Hatfield | Logistics planning and operations | Monitoring of assets | on-shore | 3 | 0 | 0 | 4 | 0 |
Detection of unexpected methane leakage on a regional basis | Hatfield | Environmental monitoring | Baseline historic mapping of environment and ecosystems | on-shore | 2 | 3 | 3 | 4 | 0 |
Determine historical ground movement for infrastructure planning | OTM | Subsidence monitoring | Infrastructure monitoring | on-shore | 3 | 3 | 3 | 0 | 1 |
Determine historical ground movement for pipeline routing | OTM | Subsidence monitoring | Infrastructure monitoring | on-shore | 3 | 1 | 1 | 0 | 0 |
Distribution and abundance of marine animals | C-CORE | Environmental monitoring | | off-shore | 3 | 3 | 3 | 3 | 3 |
Distribution and abundance of sea birds | C-CORE | Environmental monitoring | | off-shore | 3 | 3 | 3 | 3 | 1 |
Drilling survey preparation: Environmental conditions | CLS | Environmental monitoring | | off-shore | 0 | 0 | 4 | 0 | 0 |
Drilling survey preparation: Metocean conditions hindcast and forecast | CLS | Metocean | | off-shore | 0 | 4 | 0 | 0 | 0 |
Early identification of potential hydrocarbon basins | OTM | Surface geology mapping | Mapping geological features | on-shore | 4 | 3 | 1 | 0 | 0 |
Ecosystem valuation of potential sites | OTM | Environmental monitoring | Baseline historic mapping of environment and ecosystems | on-shore | 4 | 2 | 0 | 0 | 0 |
Efficiency of vessels and helicopters operations | CLS | Metocean | | off-shore | 0 | 0 | 0 | 4 | 0 |
Enabling survey to understand structural properties of the sub-surface for infrastructure planning | OTM | Surface geology mapping | Engineering geological evaluation | on-shore | 2 | 2 | 3 | 1 | 1 |
Environmental conditions | CLS | Environmental monitoring | | off-shore | 4 | 0 | 0 | 0 | 0 |
Environmental monitoring | CLS | Environmental monitoring | | off-shore | 0 | 0 | 0 | 0 | 4 |
Estimating ground bearing capacity | OTM | Logistics planning and operations | Facility siting, pipeline routing and roads | on-shore | 3 | 2 | 3 | 1 | 1 |
Estimation of the climate change impact | CLS | Environmental monitoring | | off-shore | 0 | 0 | 4 | 0 | 0 |
Evaluation of the efficiency of the structure | CLS | Metocean | | off-shore | 0 | 0 | 4 | 0 | 0 |
Firemapping | OTM | Logistics planning and operations | Support to surveying crews for planning surveys and H&S | on-shore | 3 | 3 | 3 | 3 | 3 |
Fish and fish habitat | C-CORE | Environmental monitoring | | off-shore | 3 | 3 | 3 | 3 | 3 |
Flagging environmentally sensitive areas prior to seismic surveys | OTM | Seismic planning |