Child pages
  • OTM-017: Identification of seasonal environment changes e.g. migration patterns

 
Edit

 Identification of seasonal environment changes e.g. migration patterns

Edit

 

Challenge ID

OTM:017

1

Title

Identification of seasonal environment changes e.g. migration patterns

2

Theme ID

ON 4.2: Environmental monitoring - Continuous monitoring of changes throughout the lifecycle

3

Originator of Challenge

Onshore: OTM

4

Challenge Reviewer / initiator

Statoil, PetroSA, Shell, Eni, Sasol, Exxon, Tullow, Petronas, Chevron

 

General description

Overview of Challenge

5

What is the nature of the challenge? (What is not adequately addressed at present?)

Many frontier regions are home to internationally protected wildlife for some, or all of the year.  It is important that we are aware of this so that the impact of our E&P activity on the environment can be minimised.  Therefore we must be able to identify any seasonal environmental changes such as the migration patterns of protected species.

6

Thematic information requirements

3. Obtain detailed vegetation information,  4. Obtain detailed land-use information,   6. Identify inland water bodies and determine water quality,  7. Determine air quality,    10. Fauna and presence and patterns,

7

Nature of the challenge - What effect does this challenge have on operations?

Failing to prepare for and manage the influx of protect species to our operational area would be ignoring our responsibility to the environment.  Further to this, with regard to the impact on operations, could lead to a forced shut down and increased safe

8

What do you currently do to address this challenge?/ How is this challenge conventionally addressed?

Ground patrols can be deployed as a deterrent but these are costly and not full-proof.

9

What kind of solution do you envisage could address this challenge?

 

10

What is your view on the capability of technology to meet this need? – are you currently using EO tech? If not, why not?

 

 

Challenge classification

 

11

Lifecycle stage

Pre license

Exp.

Dev.

Prod.

Decom.

Score from impact quantification [1]

1

2

2

2

2

12

Climate classification

NOT CLIMATE SPECIFIC

13

Geographic context/restrictions

Generic onshore (Unspecified)

14

Topographic classification / Offshore classification

Generic onshore (Unspecified)

15

Seasonal variations

Any season

16

Impact Area

Environmental

17

Technology Urgency

(How quickly does the user need the solution)

Immediately (0-2 years)

 

Information requirements

 

18

Update frequency

Weekly

19

Data Currently used

 

20

Spatial resolution

 

21

Thematic accuracy

 

22

Example formats

 

23

Timeliness

Within a day

24

Geographic Extent

district area

25

Existing standards

 


 


[1] Impact quantification scores: 4 – Critical/ enabling; 3 – Significant/ competitive advantage; 2 – Important but non-essential; 1 – Nice to have; 0 – No impact, need satisfied with existing technology

Edit

 

No results found.

Edit