Challenge ID: |
HCP-5305 |
Originator: |
Onshore: Hatfield |
|||||
Title: |
Identify existing linear routes for co-location of pipelines in wilderness areas. |
|||||||
Theme: |
ON 5.3: Logistics planning and operations - Facility siting, pipeline routing and roads development |
|||||||
Consortium Lead: |
Hatfield |
Interviewed Company: |
Hatfield |
|||||
Geography: |
ON.REG.00 - Generic onshore |
|||||||
Challenge Description |
||||||||
What is not possible / not adequately addressed at present? |
||||||||
Need maps of existing linear infrastructure routes and corridors that may be abandoned or belong to other operators within or proximal to current or future operating areas. |
||||||||
What effect does this challenge have on operations? |
||||||||
Reduced costs and increased access are possible if existing linear corridors can be repurposed or shared rather than clearing new routes. |
||||||||
Thematic information requirements: |
Land use Distribution and status of infrastructure |
|||||||
What do you currently do to address this challenge? How is this challenge conventionally addressed? |
||||||||
Analysis of high-resolution imagery and LiDAR in combination with existing data or report/licensing information. |
||||||||
What kind of solutions do you envisage could address this challenge? |
||||||||
High-resolution multispectral images to determine vegetation disturbance. |
||||||||
What is your view on the capability of technology to meet this need? Are you currently using EO tech? If not, why not? |
||||||||
Need EO with sufficient spatial resolution to determine corridors. Changes in canopy elevations can identify existing linear corridors. |
||||||||
Challenge Classification |
||||||||
Impact on Lifecycle (0=none, 4=high): |
Climate / Topography / Urgency: |
|||||||
Pre-license: |
1 |
Climate class: |
Generic climate |
|||||
Exploration: |
3 |
Topographic class: |
Forest / woodland |
|||||
Development: |
3 |
Seasonal variations: |
Any season |
|||||
Production: |
0 |
Impact area: |
Environmental, Health and Safety, Cost reduction |
|||||
Decommissioning: |
0 |
Technology urgency: |
2 - Short term (2-5 years) |
|||||
Challenge Information Requirements |
||||||||
Update frequency: |
Snapshot |
|||||||
Data currently used: |
Aerial imagery, optical imagery, LiDAR, field assessments |
|||||||
Spatial resolution: |
License |
|||||||
Thematic accuracy: |
Not specific |
|||||||
Required formats: |
Not specific |
|||||||
Timeliness (Vintage): |
Within six months |
|||||||
Geographic extents: |
Basin |
|||||||
Existing standards: |
None |
|||||||