Creating basemaps in politically challenging regions
|
Challenge ID |
OTM:075 |
||||
1 |
Title |
Creating basemaps in politically challenging regions |
||||
2 |
Theme ID |
ON 5.1: Logistics planning and operations - Baseline mapping of terrain and infrastructure |
||||
3 |
Originator of Challenge |
Onshore: OTM |
||||
4 |
Challenge Reviewer / initiator |
DFID |
||||
|
General description |
Overview of Challenge |
||||
5 |
What is the nature of the challenge? (What is not adequately addressed at present?) |
If you can't get government "on-side", then obtaining basemaps of an area can be very complicated, especially when aerial surveys are refused etc… |
||||
6 |
Thematic information requirements |
1. Obtain detailed topographic information, 2. Obtain detailed terrain characterisation, 3. Obtain detailed vegetation information, 5. Identify location and condition of transport infrastructure, 14. Obtain detailed imagery of the surface, |
||||
7 |
Nature of the challenge - What effect does this challenge have on operations? |
Delay in developing / exploration activity |
||||
8 |
What do you currently do to address this challenge?/ How is this challenge conventionally addressed? |
Aerial surveys, but these are often difficult to deploy if political will is not there. |
||||
9 |
What kind of solution do you envisage could address this challenge? |
Imagery which can navigate around local bureaucracy would be useful |
||||
10 |
What is your view on the capability of technology to meet this need? – are you currently using EO tech? If not, why not? |
|
||||
|
Challenge classification |
|
||||
11 |
Lifecycle stage |
Pre license |
Exp. |
Dev. |
Prod. |
Decom. |
Score from impact quantification [1] |
2 |
2 |
0 |
0 |
0 |
|
12 |
Climate classification |
NOT CLIMATE SPECIFIC |
||||
13 |
Geographic context/restrictions |
Generic onshore (Unspecified) |
||||
14 |
Topographic classification / Offshore classification |
Generic onshore (Unspecified) |
||||
15 |
Seasonal variations |
Any season |
||||
16 |
Impact Area |
Development costs |
||||
17 |
Technology Urgency (How quickly does the user need the solution) |
Immediately (0-2 years) |
||||
|
Information requirements |
|
||||
18 |
Update frequency |
Not important |
||||
19 |
Data Currently used |
|
||||
20 |
Spatial resolution |
|
||||
21 |
Thematic accuracy |
|
||||
22 |
Example formats |
|
||||
23 |
Timeliness |
Reference data - timeliness not important |
||||
24 |
Geographic Extent |
District area |
||||
25 |
Existing standards |
|
[1] Impact quantification scores: 4 – Critical/ enabling; 3 – Significant/ competitive advantage; 2 – Important but non-essential; 1 – Nice to have; 0 – No impact, need satisfied with existing technology
There is no content with the specified labels