Baseline elevation data for project planning and design
Challenge ID: |
HCP-5104 |
Originator: |
Onshore: Hatfield |
|||||
Title: |
Baseline elevation data for project planning and design. |
|||||||
Theme: |
ON 5.1: Logistics planning and operations - Baseline mapping of terrain and infrastructure |
|||||||
Consortium Lead: |
Arup |
Interviewed Company: |
Arup |
|||||
Geography: |
ON.REG.00 - Generic onshore |
|||||||
Challenge Description |
||||||||
What is not possible / not adequately addressed at present? |
||||||||
Provision of accurate elevation data for linear route planning and earthworks calculations and design, pipeline flow modelling and leak dispersion modelling - to help define prime alignment and quantification of pumping stations and block valves, and design of other oil and gas infrastructure (airstrips, CPF, LNG). |
||||||||
What effect does this challenge have on operations? |
||||||||
Reduce planning costs by determining optimal or most favourable pipeline route alignment and reducing earthworks based on accurate elevation models and data. |
||||||||
Thematic information requirements: |
Topographic information Terrain information Distribution and status of infrastructure |
|||||||
What do you currently do to address this challenge? How is this challenge conventionally addressed? |
||||||||
Aerial surveys and bespoke commissioning of satellite stereo-surveys. |
||||||||
What kind of solutions do you envisage could address this challenge? |
||||||||
High resolution optical images and DEM |
||||||||
What is your view on the capability of technology to meet this need? Are you currently using EO tech? If not, why not? |
||||||||
Mature technology with lots of choice of sensors |
||||||||
Challenge Classification |
||||||||
Impact on Lifecycle (0=none, 4=high): |
Climate / Topography / Urgency: |
|||||||
Pre-license: |
1 |
Climate class: |
Generic climate |
|||||
Exploration: |
3 |
Topographic class: |
Not specific |
|||||
Development: |
3 |
Seasonal variations: |
Any season |
|||||
Production: |
1 |
Impact area: |
Cost reduction |
|||||
Decommissioning: |
2 |
Technology urgency: |
3 - Immediately (0-2 years) |
|||||
Challenge Information Requirements |
||||||||
Update frequency: |
Snapshot |
|||||||
Data currently used: |
Landsat, ASTER, GoogleEarth, RapidEye, aerial photography |
|||||||
Spatial resolution: |
License |
|||||||
Thematic accuracy: |
Not specific |
|||||||
Required formats: |
Not specific |
|||||||
Timeliness (Vintage): |
Reference data |
|||||||
Geographic extents: |
License |
|||||||
Existing standards: |
None |
|||||||
There is no content with the specified labels